Walk Safely to School Day

21 May 2015

Parents are encouraged to walk their primary school children to school on Friday 22 May to help teach them safe pedestrian behaviour and road awareness.

 

It’s important for parents to equip their children with the practical skills needed to safely navigate roads, cross at intersections and be a responsible pedestrian. Walking them to school helps them develop the vital road crossing skills they will need when they are old enough to walk or ride to school on their own.

The national event is now in its 16th year. For further information visit the National Walk Safely to School Day website

Another positive to this event is that walking regularly at an early age has long term health benefits, with recent studies showing that walking to school is associated with higher overall physical activity throughout the day.

Latest news

64x64

Northern Connector lines painted black in new trial

01 Apr 2021

Black contrasting line marking, aimed at improving road safety and visibility, will be trialled on the Northern Connector in a state-first.

The new line marking will require the temporary full closure of the Northern Connector to all southbound traffic, and the temporary partial closure to northbound traffic, next weekend.


64x64

REMINDER: Temporary closure of intersection of South Road and Regency Road for bridge move

30 Dec 2020

As part of the Regency Road to Pym Street Project there will be a temporary partial closure of the South Road and Regency Road intersection from 5am Monday, 4 January, to 5am Monday, 11 January, weather permitting.


News archive

Road safety works

64x64

Northern Connector lines painted black in new trial

01 Apr 2021

Black contrasting line marking, aimed at improving road safety and visibility, will be trialled on the Northern Connector in a state-first.

The new line marking will require the temporary full closure of the Northern Connector to all southbound traffic, and the temporary partial closure to northbound traffic, next weekend.


64x64

Final asphalt for Darlington Upgrade Project

07 Nov 2020

As part of the Darlington Upgrade Project, night and weekend works will be undertaken in the lowered motorway and on South Road to install the final layer of asphalt and line marking.


Road safety works archive


Subscribe

Facebook Twitter YouTube