Additional southbound lane restrictions for the Darlington Upgrade Project

6 May 2019

The Department of Planning, Transport and Infrastructure (DPTI) advises motorists that lane restrictions for southbound traffic on Main South Road will be in place at the Darlington Upgrade Project for remediation works in the lowered motorway caused by recent rain.

Main South Road southbound between Sturt Road and Flinders Drive will be reduced to three lanes during peak periods, and two lanes during inter-peak. There will be no lane restrictions in place for northbound traffic on Main South Road.

This restriction is due to damage to a section of shotcrete (spray-on concrete) in the lowered motorway. It is anticipated that the restrictions will be in place for the next six weeks.

Motorists are advised to expect delays and to allow additional travel time. To ensure the safety of motorists and workers, please adhere to all lane restrictions and speed limits.

We thank motorists for their patience while these works are undertaken.

For real time roadwork information download the AddInsight app for Apple (https://itunes.apple.com/au/app/addinsight/id1099048200) or Android (https://play.google.com/store/apps/details?id=au.gov.sa.addinsight), or visit the Traffic SA website at www.traffic.sa.gov.au.

Latest news

64x64

Northern Connector lines painted black in new trial

01 Apr 2021

Black contrasting line marking, aimed at improving road safety and visibility, will be trialled on the Northern Connector in a state-first.

The new line marking will require the temporary full closure of the Northern Connector to all southbound traffic, and the temporary partial closure to northbound traffic, next weekend.


64x64

REMINDER: Temporary closure of intersection of South Road and Regency Road for bridge move

30 Dec 2020

As part of the Regency Road to Pym Street Project there will be a temporary partial closure of the South Road and Regency Road intersection from 5am Monday, 4 January, to 5am Monday, 11 January, weather permitting.


News archive

Road safety works

64x64

Northern Connector lines painted black in new trial

01 Apr 2021

Black contrasting line marking, aimed at improving road safety and visibility, will be trialled on the Northern Connector in a state-first.

The new line marking will require the temporary full closure of the Northern Connector to all southbound traffic, and the temporary partial closure to northbound traffic, next weekend.


64x64

Final asphalt for Darlington Upgrade Project

07 Nov 2020

As part of the Darlington Upgrade Project, night and weekend works will be undertaken in the lowered motorway and on South Road to install the final layer of asphalt and line marking.


Road safety works archive


Subscribe

Facebook Twitter YouTube